Essay Available:
You are here: Home → Essay → Technology
Pages:
4 pages/≈1100 words
Sources:
No Sources
Level:
APA
Subject:
Technology
Type:
Essay
Language:
English (U.S.)
Document:
MS Word
Date:
Total cost:
$ 21.6
Topic:
Individual Design Assignment: Technology, Budget, Time (Essay Sample)
Content:
Individual Design Assignment
Name:
Institution:
Date of submission:
Individual Design Assignment
Introduction
Herein is a design for the manufacture of a garden tiller, project BCDA. The project in context is aimed at producing an efficient garden tiller that would ease garden activities as much as possible i.e. reduce human effort to small units. The main source of power of the project is electricity. However, in other circumstances, solar power and wind generated power shall suffice. The aftermath of the project will be marked by a completely assembled garden tiller capable of performing garden operations with an efficiency of close to a hundred percent. Human intervention concerning the operation of BCDA is minimized to a greater extent. Most of the operations of BCDA have been automated.
1 Constraints
In project management, a restriction is any type of restriction that is capable of highlighting a project’s limitations. Constraints include everything that dictates the actions of the project team. Constraints can cover a vast territory. Commonly, triple constraints have been provided for. In most cases time, resources and quality comprise, to a greater extent, impediments. Projects, of course, cannot lack one or two of the constraints, in severe cases all the three cases of constraints. As an illustration, projects in medical industry find quality as the primary constraint, while resources and time may serve as secondary constraints. In information Technology industries, may find time as the primary constraint.
* Time
As illustrated above time can be a constraint in project management. Most cases, time as a constraint comes with deadlines set in place. This scenario is commonly referred to as make it happen now. An example concerning time as a constraint is a situation whereby you have been appointed to be in charge of a house party whereby all necessary arrangements have been met including the date set for the party. In such a situation, it is compulsory that you work within the stipulated time frame because an attempt to push the date forward would prove futile.
In this situation, time is of essence regarding the completion of the Garden Tiller project. Completion of the project in time would ensure that the deadline stipulated for the project is not violated. All activities that concern this project must be time-driven i.e. submission of results must be within the date due.
* Budget
Budget is another constraint as far project management is concerned. A budget can limit the extent to which a person can obtain resources to facilitate the whole project. An example would be avoidance of particular components of a project that are not supported by the budget. For instance, if component X would cripple the whole project, then it would be a necessity to avoid such a component. For the facilitation of the completion our project- Garden Tiller Project, expensive components are to be avoided. Of essence is the of cost tools to be used in the facilitation of the whole project.
* Technology
Use of much advanced technology is likely to stifle the rate of progression of the project at large. To this effect, recently developed technology cannot be of great help owing to the fact that adoption of such technology would take a lot of time. Teaching the technical staff on the use of the recently adopted technology on the same not would take a little bit of time. Again, it would be costly to initiate the adoption and use of much-advanced technology.
* Quality
As a restraint, quality impacts on the general outcome of the project. Owing to the fact that there is a time limit put in place for the issuance of finished project, stressing on a technically quality project would impede the speed at which the project progression moves. On the same note, somebody can’t produce the highest quality over a limited or restricted budget. On the same note, production of high quality would be impossible given the fact that time provided for the project is limited too. In reality, exceptions to these constraints never come to reality. The project for the manufacture of a garden tiller, presumably, would take five weeks. The quality of the project as provided for in the plan is taken to be medium. An attempt to escalate the quality of the tiller would take a lot of time, therefore, negatively impacting on the time frame.
* Schedule
Of uttermost importance is the issue of schedule for the project. The manufacture of a garden tiller requires the servicers of mechanics and other pertinent workpeople. Say, for example, plumbers have arrived as anticipated, and then, a reshuffle on the schedule is necessary for accommodating adjustments.
2 Functions of the design project
The design project has been enabled to function in a way that allows the movement of blades through the soil to facilitate tillage. Primarily, the blades wade through the soil crushing large particles of soil that have clumped together. The blades shall be designed in a way to ensure control over speed is achievable through automated buttons which should respond upon remote application of pressure.
It is worth noting that project BCDA requires minimal human intervention as most of the operations are automated. The overall efficiency of BCDA is high. Ease of use has been increased. All persons are capable of using BCDA in a straightforward manner. There is an increase in portability. Movement of BCDA from place to another is such an easy task. There are no complications concerning the movement of BCDA.
3 Charts & tables
portability
User friendliness
flexibility
durability
total
Get the Whole Paper!
Not exactly what you need?
Do you need a custom essay? Order right now:
Other Topics:
- Online Theft / Cybercrime Against Critical InfrastructureDescription: Cybercrime includes crimes such as spamming, hacking and phishing that are committed over the internet or computer systems platform. ...3 pages/≈825 words| 3 Sources | APA | Technology | Essay |
- The Technologies Which Might Exist in the Future - ResearchDescription: As technology remains to be the application of scientific knowledge, machinery and equipment will be in the making as long as science exists....1 page/≈275 words| 3 Sources | APA | Technology | Essay |
- Classification of CMS Core Measures and Data Used as Either Easy or HardDescription: The essential core and menu measures that were employed in the reporting can be classified as either easy or difficult to collect...2 pages/≈550 words| 3 Sources | APA | Technology | Essay |