Risk Analysis Assignment On Solylent Food Product (Case Study Sample)
Instructions:
in this task, a food product was selected for a risk based evaluation. a risk analysis matrix was used to evaluate the likely hood of the risk to occur, and the resulting impact of the risk to the organization. based on the evaluation from the matrix, a plan of action to mitigate the risks was conceived.
source..Content:
Risk analysis of Solylent Food product
Name
Institution
Introduction
This paper will perform a risk analysis of a food product named Soylent. The FDA (Food and drug administration) is investigating the product, together with the US department of agriculture. The primary concern under investigation is whether the product is safe for human consumption. In that regard, the presence of an adult product called plankton is a cause of worry. First, the paper will look at the risks involved in producing the product. This will be followed by a thorough detailed analysis of the risks using a risk matrix table. Lastly, the lessons learnt from the process and the recommendations will be presented.
Risks identified
The major risks involved in producing the product are first; the likely hood of illnesses resulting from consumption of the food product. Should illnesses occur from consumption of the product, the product will likely be recalled from the market. What is more, production of the product is likely to be halted. Consequently, the risk will have an extreme effect on the organization should it materialize. A second risk is the risk of the product being declared illegal after investigations. This is likely to occur if the investigation by the food and drug administration together with the US department of agriculture faults the product. This risk has an extreme impact on the product since production will have to stop immediately.
Risk analysis matrix
A risk analysis matrix is used to breakdown the process of analysis of specific risks in project management. The matrix has one side representing the likelihood of an event to occur. The other side represents the effect of the event in an organization. A risk matrix of Soylent is presented in the figure that follows.
LIKELYHOOD OF OCCURANCE
ASSOCIATED RISK
IMPACT ON ORGANIZATION
EXTREME
AVERAGE
LOW
VERY HIGH
HIGH RISK
HIGH RISK
MODERATE RIS
HIGH
HIGH RISK
MODERATE RISK
MODERATE RISK
LOW
Product being declared illegal
Total product failure
MODERATE RISK
MODERATE RISK
LOW RISK
VERY LOW
Getting illness after eating soylent
Product recalls
MODEARATE RISK
LOW RISK
LOW RISK
RISK MATRIX EXPLANATION
HIGH RISK
The consequences are extreme, immediate action should be taken to mitigate the risk
MODEARTE RISK
The consequences are great, but not to the extent of crippling the organization. Care should be taken
LOW RISK
The consequences are low; action can be neglected and only taken as precautionary measure.
Summary and inferences from the matrix
In the matrix, the risk in producing the products was presented. Two specific risks were analyzed. The first risk was the likelihood of the product being declared illegal. The second risk was the likelihood of getting illnesses from consuming the products. As the depicted in the matrix, the likely hood of the product being declared illegal is low. On the other hand, the risk of becoming ill after eating the solvent is very low. The explanation for the stated is provided in the press release. Based on the source, preliminary research has shown that the risk of getting illness from consuming Soylent is very low. Research is being conducted only as a precautionary measure. Moreo...
Get the Whole Paper!
Not exactly what you need?
Do you need a custom essay? Order right now:
Other Topics:
- Ethics Case Study Assignment: Professional Code of EthicsDescription: Apply the ethical decision making paradigm presented in Section 11.5 (i.e., 4steps in p. 226) to analyze the situation, present potential solutions to scenario...1 page/≈275 words| 2 Sources | APA | Engineering | Case Study |
- Design & Implementation Project Of Chapel Pill, A New Sustainable Settlement; Its Infrastruc. . .Description: Design & Implementation Project Of Chapel Pill, A New Sustainable Settlement; Its Infrastructure Needs And Delivery...18 pages/≈4950 words| 5 Sources | APA | Engineering | Case Study |
- Discharging Of A Capacitor Through A Resistor CaseDescription: In the simple RC circuit as shown below, a short circuit is used in place of the battery in order to eliminate the power supply; as a result the capacitor will be discharging through the resistor....6 pages/≈1650 words| 4 Sources | APA | Engineering | Case Study |